Diagrammes de Gantt pour la construction

    Planifiez vos projets de construction avec des répartitions détaillées par phase, une planification des ressources et un suivi des jalons conçus pour le secteur du bâtiment.

    Riverside Office Complex
    StatusDelayed
    + Invite
    Gantt
    Table
    Board
    Workload
    Overview
    AI Assistant
    #Task Name
    1
    Site Prep:
    2
    Demolition & clearing
    3
    Excavation & grading
    5
    Foundation:
    6
    Concrete pour & cure
    8
    Framing:
    9
    Roof decking & waterproof
    11
    Mechanical:
    12
    Plumbing rough-in
    13
    HVAC installation
    Jul 2025
    Aug 2025
    Today
    Permits & approvals
    Demolition & clearing
    Excavation & grading
    Foundation:
    Concrete pour & cure
    Framing:
    Roof decking & waterproof
    Mechanical:
    Plumbing rough-in
    HVAC installation
    7 tasks·4 sections·In Sync
    Scale: Days
    +
    -
    4,6/5 sur 1 017 avis

    Approuvé par plus de 25 000 équipes à travers le monde

    1

    Planifiez vos phases de construction

    Décomposez votre projet de construction en tâches et sous-tâches gérables. Organisez chaque phase — de la préparation du site et des travaux de fondation à la charpente, au lot technique et aux finitions — en sections claires avec des échéances, des dépendances et des jalons d'inspection sur votre diagramme de Gantt.

    Planifiez vos phases de construction
    2

    Gérez les équipes et les sous-traitants

    Suivez chaque ressource qui fait tourner votre chantier : ouvriers, artisans qualifiés, sous-traitants et locations de matériel. Affectez-les aux tâches pour savoir à tout moment qui est sur place et quand chaque corps d'état doit commencer.

    Gérez les équipes et les sous-traitants
    3

    Équilibrez la charge de travail du chantier

    Répartissez les tâches entre les équipes et les corps de métier pour éviter les conflits de planification et les temps d'arrêt coûteux. Surveillez la charge de travail directement sur votre diagramme de Gantt ou passez à la Vue Charge de travail pour rééquilibrer les affectations sur les chantiers actifs en temps réel.

    Équilibrez la charge de travail du chantier
    4

    Obtenez une vue d'ensemble du site

    Visualisez chaque projet et chantier actif d'un coup d'œil grâce à la Vue d'ensemble. Surveillez l'avancement des travaux, les échéances de permis et la disponibilité des équipes sans vous perdre dans les détails. Basculez entre les vues Gantt, Tableau ou Kanban selon vos besoins.

    Obtenez une vue d'ensemble du site
    5

    Partagez l'avancement avec les clients et les propriétaires

    Exportez les calendriers de construction au format PDF, PNG ou feuilles de calcul pour les partager avec les propriétaires, les entrepreneurs généraux et les investisseurs. Utilisez les Instantanés Publics pour offrir aux parties prenantes une vue en direct et en lecture seule de votre planning de construction sur Instagantt.

    Partagez l'avancement avec les clients et les propriétaires
    6

    Track Inspections and Permits

    Schedule building inspections, permit applications, and regulatory checkpoints throughout your construction timeline with clear dependencies to prerequisite work. Connect inspection milestones to the construction tasks that must be completed before each inspection can pass — framing inspection requires framing completion, electrical rough-in inspection requires wiring installation. Track inspection request lead times and schedule them proactively so inspectors do not become a bottleneck in your build sequence. When an inspection fails, immediately see the impact on downstream phases and adjust your schedule accordingly.

    Track Inspections and Permits
    7

    Manage Material Deliveries

    Track every material order from purchase requisition through supplier confirmation, shipping, and on-site delivery on your project timeline. Link material delivery dates to construction tasks with dependencies so you can see immediately when a late shipment will delay work. Long-lead items like structural steel, custom windows, specialty mechanical equipment, and imported fixtures can be tracked months in advance to ensure they arrive before the trade crew that needs them. When a supplier delays a shipment, the Gantt chart automatically shows the cascade effect on your construction schedule.

    Manage Material Deliveries
    8

    AI-Powered Build Planning

    Describe your construction project in plain English and let the AI Assistant generate a complete build plan with phases, tasks, subtasks, estimated durations, and trade dependencies. Say something like 'Plan a 3-bedroom residential construction with site prep, foundation, framing, MEP, drywall, finishing, and landscaping phases' and receive a professional construction schedule in seconds. Refine the generated plan with follow-up prompts, then save it as a template for similar builds. The AI understands construction concepts like trade sequencing, inspection gates, and weather buffers.

    AI-Powered Build Planning
    9

    Compare Schedules with Baselines

    Create baseline snapshots of your construction schedule at contract signing, groundbreaking, or any major milestone and compare the original plan against actual progress throughout the build. Baselines make schedule drift visible and quantifiable — see which phases started late, which trades took longer than estimated, and how weather delays and change orders have shifted the overall timeline. This plan-versus-actual comparison is essential for construction managers who need to document schedule changes for contract compliance, justify timeline extensions, improve estimating accuracy for future projects, and maintain accurate project documentation. The visual baseline overlay makes schedule changes immediately apparent to all stakeholders.

    Compare Schedules with Baselines
    10

    Multiple Views for Construction Teams

    Switch between Gantt chart, Table View, Board View, and Overview depending on the information your construction team needs. Use the Gantt chart for detailed phase planning with trade dependencies, the Table View for material tracking and cost analysis, the Board View for punch list and inspection management, and the Overview for site-wide progress reporting. Each view shows the same project data from a different perspective. Site managers can run daily coordination meetings using the Gantt chart and generate owner reports from the Overview without maintaining separate documents or spreadsheets.

    Multiple Views for Construction Teams
    11

    Custom Fields for Construction Data

    Add custom fields to capture construction-specific data like cost per task, trade classification, permit status, inspection result, change order number, and contract reference. Custom fields appear in the Table View as sortable, filterable columns, making it easy to generate reports by trade, analyze cost distribution by phase, or track permit approval status across all construction activities. This construction-specific data layer transforms your Gantt chart from a simple timeline into a comprehensive project management system tailored to how construction projects are actually managed and reported.

    Custom Fields for Construction Data

    Foire aux questions

    Les équipes de construction utilisent les diagrammes de Gantt pour gérer chaque phase de construction, de la préparation du site à l'inspection finale, sur une ligne de temps visuelle. Elles coordonnent les corps de métier, suivent les livraisons de matériaux, planifient les inspections et surveillent l'avancement par rapport aux prévisions. Les dépendances entre les phases s'ajustent automatiquement lorsqu'une tâche prend du retard.

    Oui. Vous pouvez affecter des tâches à différents corps de métier et sous-traitants, suivre leurs calendriers sur la même ligne de temps et utiliser la Vue Charge de travail pour voir qui est disponible. Les instantanés publics permettent aux sous-traitants de consulter le planning sans avoir besoin de compte.

    Lorsque vous déplacez une tâche en raison d'un retard météo ou d'une autre perturbation, toutes les tâches dépendantes en aval sont automatiquement replanifiées. Les lignes de base vous permettent de comparer le plan initial au calendrier actuel pour quantifier le retard et communiquer son impact aux propriétaires du projet.

    Oui. Instagantt prend en charge le suivi des heures estimées et des coûts par tâche. Vous pouvez affecter des taux horaires, définir des budgets par phase et comparer les coûts réels aux coûts estimés sur l'ensemble de votre projet pour respecter votre budget.

    Prêt à essayer Diagrammes de Gantt pour la construction ?

    Commencez gratuitement, sans carte de crédit. Voyez la différence en quelques minutes.